Project Completion Certificate (Ground Water)
Scheme ID: 20011981 Name of Scheme: Chakjafri GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2095 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 02-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 16.35 TW 25.9677516 83.357057
2 Plain Pipe 150mm 45.04 TW 25.9677516 83.357057
3 Housing Pipe 200mm 42.16 TW 25.9677516 83.357057
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 450/46 TW 25.9677516 83.357057
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 125/12 OHT 25.9677516 83.357057
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.84
2 HDPE Pipe PN-6: Class PE-100 75 0.68
3 HDPE Pipe PN-6: Class PE-100 90 0.25
4 HDPE Pipe PN-6: Class PE-100 110 0.48
5 HDPE Pipe PN-6: Class PE-100 140 0.23
6 HDPE Pipe PN-6: Class PE-100 160 0.46
7 HDPE Pipe PN-6: Class PE-100 200 0.16
HSC Connection
Sno. Total Nos.
1 285
Other Details
1.93
1.60
1.75
01-Aug-2025
02-Feb-2026