| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012372 | Name of Scheme: BHAWARI WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 6633 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Aug-2025 | Actual Date of Completion (Capex): 24-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TW | 50/150 | BHAWARI | 26 | 82 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 28/57 | BHAWARI | 26 | 82 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | BHAWARI | 26 | 82 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 1.535 | |
| 2 | HDPE | 160 | 0.438 | |
| 3 | HDPE | 140 | 0.170 | |
| 4 | HDPE | 90 | 2.381 | |
| 5 | HDPE | 75 | 2.115 | |
| 6 | HDPE | 63 | 20.567 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 996 |