Project Completion Certificate (Ground Water)
Scheme ID: 20012577 Name of Scheme: Chirchita No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-May-2023 Actual Date of Completion (Capex): 05-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30.6 M/ 39.15M Chirchita 28.384617 77.917114
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 48.60 M Chirchita 28.384617 77.917114
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 14 M Chirchita 28.384769 77.917274
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.6
2 HDPE 75 1.73
3 HDPE 90 0.66
4 HDPE 110 1.39
5 HDPE 125 0.35
6 HDPE 140 0.19
7 HDPE 160 0.44
8 HDPE 180 2.0
9 HDPE 200 0.74
HSC Connection
Sno. Total Nos.
1 980
Other Details
3.48
3.30
3.36
26-Dec-2025
27-Dec-2025