Scheme ID: 20012605 Name of Scheme: Badi Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3320 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 30-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36/164 BADI 82.56351 25.336155
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 45.69 Badi 82.56351 25.336155
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - ZnAl 225/14 Badi 82.56351 25.336155
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 .030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.060
2 HDPE 75 0.456
3 HDPE 90 0.409
4 HDPE 110 1.211
5 HDPE 160 .036
HSC Connection
Sno. Total Nos.
1 233
Other Details
2.28
2.37
2.37
30-Dec-2025
01-Jan-2026