| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012881 | Name of Scheme: KASAMABAD WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2145 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Nov-2023 | Actual Date of Completion (Capex): 21-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.0 MTR/127.31 MTR | KASAMABAD | 29.20175 | 78.512432 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 12.5 HP | 450 LMP/49 MTR | KASAMABAD | 29.20175 | 78.512432 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 MTR | KASAMABAD | 29.201814 | 78.512416 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 100 | 0.023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 CLASS PE-100 | 110 | 0.274 | |
| 2 | HDPE PIPE PN-6 CLASS PE-100 | 90 | 0.402 | |
| 3 | HDPE PIPE PN-6 CLASS PE-100 | 75 | 0.801 | |
| 4 | HDPE PIPE PN-6 CLASS PE-100 | 63 | 4.878 | |
| 5 | HDPE PIPE PN-6 CLASS PE-100 | 125 | 0.254 | |
| 6 | HDPE PIPE PN-6 CLASS PE-100 | 160 | 0.071 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 393 |