Scheme ID: 20012886 Name of Scheme: Turkimau No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3200 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Feb-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/156.80 Turkimau 26.261203 79.997384
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 49.30/66 Turkimau 26.261203 79.997384
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 Turkimau 26.261203 79.997384
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.0 As per Site
2 HDPE 75 0.93 As per Site
3 HDPE 90 0.15 As per Site
4 HDPE 110 1.89 As per Site
5 HDPE 140 0.39 As per Site
6 HDPE 160 0.25 As per Site
HSC Connection
Sno. Total Nos.
1 535
Other Details
1.98
2.19
2.19
19-Sep-2023
01-Oct-2023