Project Completion Certificate (Ground Water)
Scheme ID: 20013518 Name of Scheme: MILK KARIMABAD W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2367 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2021 Actual Date of Completion (Capex): 20-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 94M/24M Milak Karimabad 28.181947, 77.660002
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submercible 500LPM/49M Milak Karimabad 28.181947 77.660002
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL/16M Milak Karimabad 28.181947 77.660002
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 hdpe 63 3.5
2 HDPE 75 0.117
3 HDPE 90 0.262
4 HDPE 110 0.230
5 HDPE 125 0.482
6 HDPE 140 0.129
7 HDPE 160 0.159
8 HDPE 200 2.065
HSC Connection
Sno. Total Nos.
Other Details
1.86
1.88
1.88
10-Apr-2023
11-Apr-2023