| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013521 | Name of Scheme: UNCHA AMIRPUR W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4017 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Mar-2022 | Actual Date of Completion (Capex): 21-Sep-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 91.37M/30.24M | Uncha Amirpur | 28.609484, | 77.624247 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submercible | 900LPM/44M | Uncha Amirpur | 28.609484, | 77.624247 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 KL/14M | Uncha Amirpur | 28.609484, | 77.624247 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.9 | |
| 2 | HDPE | 75 | 3.7 | |
| 3 | HDPE | 90 | 0.256 | |
| 4 | HDPE | 110 | 0.482 | |
| 5 | HDPE | 160 | 0.291 | |
| 6 | HDPE | 200 | 0.207 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 809 |