| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013801 | Name of Scheme: Shrin nagar | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2220 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 30-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.05/95.28 | SHRINAGAR | 27.774259 | 79.388094 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 29.34 M3/45M | SHRINAGAR | 27.774259 | 79.388094 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL-16 M | SHRINAGAR | 27.774255 | 79.388094 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 5.622 | |
| 2 | HDPE / 6KG | 75 | 0.314 | |
| 3 | HDPE / 6KG | 90 | 1.818 | |
| 4 | HDPE / 6KG | 110 | 0.393 | |
| 5 | HDPE / 6KG | 140 | 0.800 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 450 |