Project Completion Certificate (Ground Water)
Scheme ID: 20014069 Name of Scheme: BARAGUNNU CHITTAURA PWS MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 5534 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 20-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/242.5 BARA GUNNU 27.61588 81.686225
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 42/39 BARA GUNNU 27.61588 81.686225
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 BARA GUNNU 27.615678 81.686239
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 150 0.03708
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 9.186
2 HDPE Pipe PN-6; Class PE-100 75 1.194
3 HDPE Pipe PN-6; Class PE-100 90 0.901
4 HDPE Pipe PN-6; Class PE-100 110 0.954
5 HDPE Pipe PN-6; Class PE-100 140 1.237
6 HDPE Pipe PN-6; Class PE-100 160 0.338
HSC Connection
Sno. Total Nos.
1 527
Other Details
2.49
2.34
2.31
20-Nov-2025
21-Nov-2025