Project Completion Certificate (Ground Water)
Scheme ID: 20014452 Name of Scheme: ALADADPUR NEWADA No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 3595 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 20-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.86 M/ 105.84 M ALADADPUR NEWADA 27.00906 80.428812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.800 M³ per Min /45Mtr ALADADPUR NEWADA 27.00906 80.428812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 16 Mtr ALADADPUR NEWADA 27.009112 80.428854
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0187
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6, CLASS PE-100 63 4.0573
2 HDPE PIPE PN-6, CLASS PE-100 75 2.3996
3 HDPE PIPE PN-6, CLASS PE-100 90 1.9728
4 HDPE PIPE PN-6, CLASS PE-100 110 0.8487
5 HDPE PIPE PN-6, CLASS PE-100 140 0.321
6 HDPE PIPE PN-6, CLASS PE-100 160 0.975
7 HDPE PIPE PN-6, CLASS PE-100 200 0.034
HSC Connection
Sno. Total Nos.
1 337
Other Details
2.78
0.00
2.37
19-Jul-2023
24-Dec-2024