| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014655 | Name of Scheme: Tah Khurd Kalan | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 4830 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.04/108.39 | TAH KHURD KALAN | 28.189026 | 80.201356 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 64.44/43 | TAH KHURD KALAN | 28.189026 | 80.201356 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 300/12 | TAH KHURD KALAN | 28.189021 | 80.201461 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 23.599 | |
| 2 | HDPE / 6KG | 75 | 0.406 | |
| 3 | HDPE / 6KG | 90 | 0.988 | |
| 4 | HDPE / 6KG | 110 | 0.239 | |
| 5 | HDPE / 6KG | 140 | 0.495 | |
| 6 | HDPE / 6KG | 160 | 0.218 | |
| 7 | HDPE / 6KG | 180 | 0.033 | |
| 8 | HDPE / 6KG | 200 | 0.077 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 952 |