| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014657 | Name of Scheme: Harna Ja Nagra | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2310 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 09-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.09/101.63 | Harna Ja Nagra | 28.090499 | 80.040677 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 30.96/45 | Harna Ja Nagra | 28.090499 | 80.040677 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 150/16 | Harna Ja Nagra | 28.090611 | 80.040695 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 6.195 | |
| 2 | HDPE / 6KG | 90 | 2.168 | |
| 3 | HDPE / 6KG | 140 | 2.086 | |
| 4 | HDPE / 6KG | 160 | 0.382 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 405 |