| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014723 | Name of Scheme: RAMPUR UTTARI | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 4510 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.00/75.04 | RAMPUR UTTRI | 28.062805 | 79.707363 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 59.34 M3/45 M | RAMPUR UTTRI | 28.062805 | 79.707363 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 300 KL - 16 M | RAMPUR UTTRI | 28.062809 | 79.707366 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 4.590 | |
| 2 | HDPE / 6KG | 75 | 0.289 | |
| 3 | HDPE / 6KG | 90 | 0.094 | |
| 4 | HDPE / 6KG | 110 | 1.623 | |
| 5 | HDPE / 6KG | 140 | 2.384 | |
| 6 | HDPE / 6KG | 180 | 1.156 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 923 |