Project Completion Certificate (Ground Water)
Scheme ID: 20014753 Name of Scheme: AKOLHI MUBARAKPUR GP WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 10
Total Population Covered: 3510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 23-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 24 TW 26.150084 83.598813
2 Plane Pipe 126.5 TW 26.150084 83.598813
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 750/46 TW 26.150084 83.598813
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 225/12 OHT 26.150086 83.598812
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 13.596
2 HDPE PN6 PE 100 75 2.382
3 HDPE PN6 PE 100 90 0.423
4 HDPE PN6 PE 100 110 2.243
5 HDPE PN6 PE 100 160 0.051
6 HDPE PN6 PE 100 180 0.088
HSC Connection
Sno. Total Nos.
1 519
Other Details
3.09
2.95
2.33
21-Dec-2025
23-Mar-2026