Project Completion Certificate (Ground Water)
Scheme ID: 20014811 Name of Scheme: KHARKHARI No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2480 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23.99/75.17 KHARKHARI 28.011806 79.726605
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 32.04 M3/43 M KHARKHARI 28.011806 79.726605
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL-12 M KHARKHARI 28.011811 79.726625
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.478
2 HDPE / 6KG 75 0.990
3 HDPE / 6KG 90 0.160
4 HDPE / 6KG 110 0.538
5 HDPE / 6KG 140 0.070
6 HDPE / 6KG 160 0.121
HSC Connection
Sno. Total Nos.
1 507
Other Details
2.08
0.00
2.07
04-Apr-2024
06-Dec-2024