Project Completion Certificate (Ground Water)
Scheme ID: 20015016 Name of Scheme: Sarai Jalal No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2440 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Oct-2022 Actual Date of Completion (Capex): 02-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.07 Mtr 149.23 Mtr Sarai Jalal 26.70125* 79.137743*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 30.01 (M3/Hr.)/ 49 Mtr. Sarai Jalal 26.70125* 79.137743*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.0150
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.466
2 HDPE 110 1.144
3 HDPE 160 0.314
HSC Connection
Sno. Total Nos.
1 367
Other Details
1.73
2.19
2.19
02-Aug-2024
03-Aug-2024