| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015023 | Name of Scheme: DARAPUR BARETHI GRAMIN PEYJAL YOJNA | No. of Villages: 4 | No. of Habitation Covered: 5 |
| Total Population Covered: 3007 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 30-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300mm Dia Plain Pipe | 61.11 | Darapur Barethi | 27.00444667 | 79.59516 |
| 2 | 150mm Dia Plain Pipe | 99.28 | Darapur Barethi | 27.00444667 | 79.59516 |
| 3 | 150mm Dia Slotted Pipe | 24 | Darapur Barethi | 27.00444667 | 79.59516 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 662/53 | Darapur Barethi | 27.00444667 | 79.59516 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn-Al Tank | 200/12 | Darapur Barethi | 27.00444667 | 79.59516 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 100 | 0.033 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution/HDPE | 63 | 9.078 | |
| 2 | Distribution/HDPE | 90 | 1.269 | |
| 3 | Distribution/HDPE | 110 | 1.476 | |
| 4 | Distribution/HDPE | 140 | 0.118 | |
| 5 | Distribution/HDPE | 160 | 0.555 | |
| 6 | Distribution/HDPE | 180 | 0.891 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 527 |