Scheme ID: 20015036 Name of Scheme: Dadra No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 3050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 14-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 27/150.73 DADRA 26.563484 79.08599
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 42.06(M³/Hr.)/53Mtr. DADRA 26.563484 79.08599
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/20 DADRA 26.563484 79.08599
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.654
2 HDPE 75 1.481
3 HDPE 90 3.209
4 HDPE 110 2.188
5 HDPE 140 2.580
6 HDPE 160 1.441
7 HDPE 180 0.767
8 HDPE 200 0.314
HSC Connection
Sno. Total Nos.
1 544
Other Details
2.48
2.65
2.65
29-Apr-2024