Project Completion Certificate (Ground Water)
Scheme ID: 20015037 Name of Scheme: Neware No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 2000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2022 Actual Date of Completion (Capex): 10-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18/137.68 Newere 26.452985 79.218504
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 27.01(M³/Hr.)/77Mtr. Newere 26.452985 79.218504
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/20 Newere 26.452985 79.218504
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 80 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.699
2 HDPE 75 1.353
3 HDPE 90 1.617
4 HDPE 110 0.090
5 HDPE 140 0.851
6 HDPE 160 0.246
HSC Connection
Sno. Total Nos.
1 302
Other Details
1.67
1.87
1.87
31-Mar-2024
01-Apr-2024