Project Completion Certificate (Ground Water)
Scheme ID: 20015038 Name of Scheme: Pachaya gaon No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 3900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 19-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.01 Mtr /118.40 Mtr PACHHAYAGAON 26.753046* 78.84743*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 45 M^3/60 mTR PACHHAYAGAON 26.753046* 78.84743*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL /20 Mtr PACHHAYAGAON 26.753046* 78.84743*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0395
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.990
2 HDPE 75 3.000
3 HDPE 90 1.440
4 HDPE 110 2.490
5 HDPE 140 1.480
6 HDPE 160 0.940
7 HDPE 180 0.650
HSC Connection
Sno. Total Nos.
1 659
Other Details
2.49
2.92
2.92
24-Jul-2024
25-Jul-2024