Scheme ID: 20015075 Name of Scheme: MALARIYA MIRZAPUR Jaititipur No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2390 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.04/96.36 MALARIYA MIRZAPUR 27.939023 79.544745
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 29.88/45 MALARIYA MIRZAPUR 27.939023 79.544745
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/16 MALARIYA MIRZAPUR 27.939023 79.544745
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.662
2 HDPE / 6KG 75 2.041
3 HDPE / 6KG 90 0.926
4 HDPE / 6KG 110 0.056
5 HDPE / 6KG 140 2.186
6 HDPE / 6KG 160 0.237
HSC Connection
Sno. Total Nos.
1 395
Other Details
2.36
0.00
2.24
24-Mar-2024
06-Dec-2024