| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015144 | Name of Scheme: Kudariya | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 3450 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2022 | Actual Date of Completion (Capex): 29-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24 Mtr/151.35 Mtr | KUDARIYA | 26.206844* | 79.176368* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 42 M^3/49 Mtr | KUDARIYA | 26.206844* | 79.176368* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/ 16 Mtr | KUDARIYA | 26.206844* | 79.176368* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | .020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.396 | |
| 2 | HDPE | 110 | .205 | |
| 3 | HDPE | 160 | .105 | |
| 4 | HDPE | 180 | 2.184 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 680 |