Project Completion Certificate (Ground Water)
Scheme ID: 20015525 Name of Scheme: Chavar Khas WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2410 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.08/79.38 CHAVAR KHAS 27.956074 79.649088
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 32.4M3/45M CHAVAR KHAS 27.956074 79.649088
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL-16M CHAVAR KHAS 27.956003 79.649015
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 125 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 6.709
2 HDPE/6KG 75 0.845
3 HDPE/6KG 90 2.675
4 HDPE/6KG 110 0.280
5 HDPE/6KG 140 0.101
6 HDPE/6KG 160 0.940
HSC Connection
Sno. Total Nos.
1 351
Other Details
2.08
0.00
2.08
25-Mar-2024
06-Dec-2024