| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015608 | Name of Scheme: KHANPUR KASAWA GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2333 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 22-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200mm Dia Plain Pipe | 58.92 | Khanpur Kasawa | 27.056963 | 79.549165 |
| 2 | 150mm Dia Plain Pipe | 7.4 | Khanpur Kasawa | 27.056963 | 79.549165 |
| 3 | 200mm Dia Slotted Pipe | 6 | Khanpur Kasawa | 27.056963 | 79.549165 |
| 4 | 150mm Dia Slotted Pipe | 12 | Khanpur Kasawa | 27.056963 | 79.549165 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 516/56 | Khanpur Kasawa | 27.056963 | 79.549165 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn- Al Tank | 150/10 | Khanpur Kasawa | 27.056963 | 79.549165 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution Pipe/HDPE | 63 | 3.775 | |
| 2 | Distribution Pipe/HDPE | 75 | 0.450 | |
| 3 | Distribution Pipe/HDPE | 90 | 0.994 | |
| 4 | Distribution Pipe/HDPE | 110 | 0.045 | |
| 5 | Distribution Pipe/HDPE | 125 | 0.006 | |
| 6 | Distribution Pipe/HDPE | 160 | 0.437 | |
| 7 | Distribution Pipe/HDPE | 180 | 0.580 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 373 |