Project Completion Certificate (Ground Water)
Scheme ID: 20015633 Name of Scheme: Baraura No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2720 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWEL 22/98.42 BARAURA 27.96827 79.939055
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 36.36M3/45M BARAURA 27.96827 79.939055
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL-16M BARAURA 27.96750 79.939002
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 3.204
2 HDPE/6KG 75 0.250
3 HDPE/6KG 90 0.243
4 HDPE/6KG 110 0.053
5 HDPE/6KG 140 0.086
6 HDPE/6KG 160 0.201
HSC Connection
Sno. Total Nos.
1 478
Other Details
1.80
0.00
1.80
03-Sep-2024
06-Dec-2024