Project Completion Certificate (Ground Water)
Scheme ID: 20015763 Name of Scheme: Bhargawan dadrol W/s No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3430 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/96.29 BHARGAWAN 27.730637 79.903503
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 40.80 M3 / 47M BHARGAWAN 27.730637 79.903503
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL - 18 M BHARGAWAN 27.730655 79.903525
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.485
2 HDPE / 6KG 75 0.368
3 HDPE / 6KG 90 2.203
4 HDPE / 6KG 110 0.503
5 HDPE / 6KG 140 0.597
6 HDPE / 6KG 160 0.394
HSC Connection
Sno. Total Nos.
1 644
Other Details
2.32
0.00
2.32
30-Nov-2024
06-Dec-2024