Project Completion Certificate (Ground Water)
Scheme ID: 20015817 Name of Scheme: Zasopur No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 2554 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 30-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 12/63 Zasopur 25.828962 82.683657
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-12.5HP 600/47.30 Zasopur 25.828962 82.683657
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/12M Zasopur 25.828885 82.683645
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 140 0.318
2 HDPE PIPE PN-6 110 1.525
3 HDPE PIPE PN-6 90 0.659
4 HDPE PIPE PN-6 75 0.246
5 HDPE PIPE PN-6 63 10.214
HSC Connection
Sno. Total Nos.
1 286
Other Details
2.51
2.51
1.92
30-Jul-2026
31-Jul-2026