Project Completion Certificate (Ground Water)
Scheme ID: 20015936 Name of Scheme: CHAK KANHU No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2850 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 25.07/84.32 CHAK KANHU 27.97814 80.004005
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 37.8 M3 / 45 M CHAK KANHU 27.97814 80.004005
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 175 KL - 16 M CHAK KANHU 27.97800 80.004029
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 15.171
2 HDPE / 6KG 75 1.586
3 HDPE / 6KG 90 1.128
4 HDPE / 6KG 110 0.038
5 HDPE / 6KG 140 0.029
6 HDPE / 6KG 160 0.546
HSC Connection
Sno. Total Nos.
1 607
Other Details
2.57
0.00
2.57
30-Nov-2023
06-Dec-2024