Scheme ID: 20016025 Name of Scheme: Banchawali No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 3074 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-May-2023 Actual Date of Completion (Capex): 02-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.05 M / 86.87 M Banchawali 28.344241 77.758698
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 46.60 M Banchawali 28.344241 77.758698
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 12 M Banchawali 28.344243 77.758698
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 16.10
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.87
2 HDPE 75 0.40
3 HDPE 90 0.32
4 HDPE 110 0.44
5 HDPE 125 0.48
6 HDPE 140 0.21
7 HDPE 160 0.14
8 HDPE 180 0.34
HSC Connection
Sno. Total Nos.
1 522
Other Details
2.11
2.01
2.13
30-Jan-2026