Project Completion Certificate (Ground Water)
Scheme ID: 20016192 Name of Scheme: MAHURI KALAN JARWAL MVS PWS No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 9156 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 20-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.01/266.52 MAHURI KALA 27.216768 81.557203
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 72/37 MAHURI KALA 27.216768 81.557203
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350/14 MAHURI KALA 27.216871 81.557355
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 200 0.0214
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 14.43
2 HDPE Pipe PN-6; Class PE-100 75 1.709
3 HDPE Pipe PN-6; Class PE-100 90 2.28
4 HDPE Pipe PN-6; Class PE-100 110 2.236
5 HDPE Pipe PN-6; Class PE-100 160 1.53
6 HDPE Pipe PN-6; Class PE-100 200 1.568
HSC Connection
Sno. Total Nos.
1 690
Other Details
3.51
3.51
3.47
20-Nov-2025
21-Nov-2025