| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20016384 | Name of Scheme: Ararpakar water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 10 |
| Total Population Covered: 4974 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Dec-2021 | Actual Date of Completion (Capex): 05-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.1 / 78.56 | Ararpakar | 27.49416 | 82.10319 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 30.1 / 78.56 | Ararpakar | 27.49416 | 82.10319 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/16 Mtr | Ararpakar | 27.49416 | 82.10319 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.737 | |
| 2 | HDPE | 169 | 0.854 | |
| 3 | HDPE | 140 | 3.391 | |
| 4 | HDPE | 110 | 2.668 | |
| 5 | HDOE | 90 | 1.159 | |
| 6 | HDPE | 75 | 1.113 | |
| 7 | HDPE | 63 | 10.158 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 680 |