Project Completion Certificate (Ground Water)
Scheme ID: 20016384 Name of Scheme: Ararpakar water supply scheme No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 4974 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Dec-2021 Actual Date of Completion (Capex): 05-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.1 / 78.56 Ararpakar 27.49416 82.10319
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 30.1 / 78.56 Ararpakar 27.49416 82.10319
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/16 Mtr Ararpakar 27.49416 82.10319
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.737
2 HDPE 169 0.854
3 HDPE 140 3.391
4 HDPE 110 2.668
5 HDOE 90 1.159
6 HDPE 75 1.113
7 HDPE 63 10.158
HSC Connection
Sno. Total Nos.
1 680
Other Details
2.53
0.00
3.75
05-Aug-2025
05-Aug-2025