Project Completion Certificate (Ground Water)
Scheme ID: 20016432 Name of Scheme: JAMUKA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3830 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 27-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/95.34 JAMUKA 27.851951 79.984018
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 45.60 M3 / 41 M JAMUKA 27.851951 79.984018
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 225 KL - 12 M JAMUKA 27.851964 79.984024
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.549
2 HDPE / 6KG 75 0.283
3 HDPE / 6KG 90 0.165
4 HDPE / 6KG 110 0.941
5 HDPE / 6KG 140 0.082
6 HDPE / 6KG 160 0.684
HSC Connection
Sno. Total Nos.
1 807
Other Details
2.85
0.00
2.82
26-Oct-2024
06-Dec-2024