Project Completion Certificate (Ground Water)
Scheme ID: 20016905 Name of Scheme: Duguna Uparwar Multi Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2994 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 30-Jul-2025 Actual Date of Completion (Capex): 30-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 100.5/87 Duguna Uparwar 82.215367 25.237856
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 38.45 Duguna Uparwar 82.215367 25.237856
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl 200/18 Duguna Uparwar 82.215367 25.237856
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 .030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 15.141
2 HDPE 75 1.799
3 HDPE 90 1.646
4 HDPE 110 1.501
5 HDPE 140 0.160
6 HDPE 160 0.030
HSC Connection
Sno. Total Nos.
1 380
Other Details
2.81
2.86
2.86
31-Oct-2025
01-Nov-2025