| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20016959 | Name of Scheme: POORE BHAN Multi Village Water Supply Scheme | No. of Villages: 5 | No. of Habitation Covered: 5 |
| Total Population Covered: 2740 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2022 |
| Date of Completion (As per Contract): 30-Jul-2025 | Actual Date of Completion (Capex): 30-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 134.75/105 | Poore Bhan | 82.336653 | 25.378608 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 34.62 | Poore Bhan | 82.336653 | 25.378608 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZnAl | 175/12 | Poore Bhan | 82.336653 | 25.378608 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | .030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.576 | |
| 2 | HDPE | 90 | 1.238 | |
| 3 | HDPE | 110 | 1.274 | |
| 4 | HDPE | 140 | 0.615 | |
| 5 | HDPE | 160 | 0.020 | |
| 6 | HDPE | 75 | 0.570 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 249 |