Project Completion Certificate (Ground Water)
Scheme ID: 20017164 Name of Scheme: KONA SONBARSA No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Jun-2023 Actual Date of Completion (Capex): 20-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27/126 Kona Sonbarsa 26.59 83.48
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 54/46 Kona Sonbarsa 26.59 83.48
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 250/18 Kona Sonbarsa 26.59 83.48
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.02 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.25 Laying Completed
2 HDPE 75 3.53 Laying Completed
3 HDPE 90 1.32 Laying Completed
4 HDPE 110 0.77 Laying Completed
5 HDPE 140 0.34 Laying Completed
6 HDPE 160 0.47 Laying Completed
HSC Connection
Sno. Total Nos.
1 562
Other Details
2.73
0.00
2.71
31-Jul-2026
01-Aug-2026