Project Completion Certificate (Ground Water)
Scheme ID: 20017193 Name of Scheme: Akbarabad Urf Khairpu No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 22-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.00 / 82.00 AKBARABAD URF KHAIRPUR 27.97504 79.681316
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 39.30 M3 /45 M AKBARABAD URF KHAIRPUR 27.97504 79.681316
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200 KL - 16 M AKBARABAD URF KHAIRPUR 27.97517 79.681328
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 3.599
2 HDPE / 6KG 75 0.365
3 HDPE / 6KG 90 0.105
4 HDPE / 6KG 110 0.135
5 HDPE / 6KG 140 0.238
6 HDPE / 6KG 160 0.420
HSC Connection
Sno. Total Nos.
1 405
Other Details
2.09
0.00
2.09
21-Oct-2024
06-Dec-2024