| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017810 | Name of Scheme: GULAOTI KHURD GRAM PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2380 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Feb-2023 | Actual Date of Completion (Capex): 21-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWWLL | 98M/24M | Gulawathi Khurd | 28.567663 | , 77.636973 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submercible | 500LPM/55M | Gulawathi Khurd | 28.567663 | , 77.636973 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 100 KL/12M | Gulawathi Khurd | 28.567663 | , 77.636973 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.024 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.851 | |
| 2 | HDPE | 75 | 0.280 | |
| 3 | HDPE | 90 | 0.329 | |
| 4 | HDPE | 110 | 0.259 | |
| 5 | HDPE | 125 | 0.187 | |
| 6 | HDPE | 140 | 0.378 | |
| 7 | HDPE | 160 | 0.029 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 291 |