Project Completion Certificate (Ground Water)
Scheme ID: 20017815 Name of Scheme: MANDPA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3998 Base Year: 2019 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2021 Actual Date of Completion (Capex): 20-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 99M/21M Mandapa 28.561268, 77.628944
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 850LPM/51M Mandapa 28.561268, 77.628944
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/12M Mandapa 28.561268, 77.628944
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI` 100 0.21
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.630
2 HDPE 75 0.503
3 HDPE 90 0.481
4 HDPE 110 0.093
5 HDPE 125 0.161
6 HDPE 160 0.396
HSC Connection
Sno. Total Nos.
Other Details
2.43
2.48
2.48
10-Apr-2023
11-Apr-2023