Project Completion Certificate (Ground Water)
Scheme ID: 20018218 Name of Scheme: Pachganwa No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3104 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 25-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33/159.3 Pachgawan 26.94 83.26
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/41 Pachgawan 26.94 83.26
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/14 Pachgawan 26.94 83.26
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.97 Laying Completed
2 HDPE 75 3.18 Laying Completed
3 HDPE 90 0.68 Laying Completed
4 HDPE 110 0.4 Laying Completed
5 HDPE 140 0.33 Laying Completed
6 HDPE 160 0.74 Laying Completed
HSC Connection
Sno. Total Nos.
1 540
Other Details
2.55
0.00
2.55
08-Feb-2024
01-Oct-2026