| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018367 | Name of Scheme: Allabal Pur W/S Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2028 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2026 | Actual Date of Completion (Capex): 18-Oct-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.10/149.21 | ALAWALPUR | 27.293307 | 79.404057 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 27/56.68 | ALAWALPUR | 27.293307 | 79.404057 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/12 | ALAWALPUR | 27.293307 | 79.404057 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 80 | 32.40 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.991 | |
| 2 | HDPE | 75 | 0.1948 | |
| 3 | HDPE | 90 | 0.1535 | |
| 4 | HDPE | 110 | 0.1694 | |
| 5 | HDPE | 140 | 0.2617 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 283 |