Project Completion Certificate (Ground Water)
Scheme ID: 20018367 Name of Scheme: Allabal Pur W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2028 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2026 Actual Date of Completion (Capex): 18-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.10/149.21 ALAWALPUR 27.293307 79.404057
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 27/56.68 ALAWALPUR 27.293307 79.404057
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 ALAWALPUR 27.293307 79.404057
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 80 32.40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.991
2 HDPE 75 0.1948
3 HDPE 90 0.1535
4 HDPE 110 0.1694
5 HDPE 140 0.2617
HSC Connection
Sno. Total Nos.
1 283
Other Details
1.86
1.71
1.86
18-Oct-2026
19-Oct-2026