| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018508 | Name of Scheme: Dehjuri | No. of Villages: 3 | No. of Habitation Covered: 14 |
| Total Population Covered: 2642 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 21-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X150 | 30.13/196.22 | Dehjuri | 25.741598 | 82.526305 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-12.5HP | 600/49.90 | Dehjuri | 25.741598 | 82.526305 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL-14M | Dehjuri | 25.74152 | 82.526255 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.051 | |
| 2 | HDPE PIPE PN-6 | 140 | 0.264 | |
| 3 | HDPE PIPE PN-6 | 110 | 1.661 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.961 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.319 | |
| 6 | HDPE PIPE PN-6 | 63 | 9.458 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 396 |