Project Completion Certificate (Ground Water)
Scheme ID: 20018767 Name of Scheme: Gobari water supply scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3697 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Dec-2021 Actual Date of Completion (Capex): 31-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 94.00
2 HDPE 160 22
3 HDPE 140 1943
4 HDPE 110 1566
5 HDPE 90 4746
6 HDPE 75 471
7 HDPE 63 7858
HSC Connection
Sno. Total Nos.
Other Details
2.77
0.00
4.30
31-Aug-2024
31-Aug-2024