Project Completion Certificate (Ground Water)
Scheme ID: 20018772 Name of Scheme: Dandav water supply scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3784 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2023 Actual Date of Completion (Capex): 05-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.00 / 146.24 Dandav 27.51917 82.2669
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 820 LPM Discharge/ 41 mtr Head Dandav 27.51917 82.2669
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/14 Mtr Dandav 27.51917 82.2669
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.0171
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.032
2 HDPE 160 0.309
3 HDPR 140 2.366
4 HDPR 110 1.505
5 HDPE 90 0.894
6 HDPE 75 1.736
7 HDPE 63 4.381
HSC Connection
Sno. Total Nos.
1 680
Other Details
3.53
0.00
3.75
05-Aug-2025
05-Aug-2025