Project Completion Certificate (Ground Water)
Scheme ID: 20019484 Name of Scheme: Katia Bujurg No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4081 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 13-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00 / 100.40 KATIA BUJURG 27.972758 79.924886
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 48.6 M3 / 45 M KATIA BUJURG 27.972758 79.924886
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 250 KL- 16 K KATIA BUJURG 27.972774 79.924873
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K 7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6 KG 63 4.161
2 HDPE / 6 KG 75 0.433
3 HDPE / 6 KG 90 0.652
4 HDPE / 6 KG 110 0.667
5 HDPE / 6 KG 140 0.611
6 HDPE / 6 KG 160 1.016
HSC Connection
Sno. Total Nos.
1 772
Other Details
2.58
0.00
2.57
13-Jul-2024