Project Completion Certificate (Ground Water)
Scheme ID: 20019686 Name of Scheme: Fakharpur No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3110 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 19-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/70 BARSAT 26° 21' 39.7296" N 82° 43' 27.3792" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 33/47 BARSAT 26° 21' 39.7296" N 82° 43' 27.3792" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150/16 BARSAT 26° 21' 39.7296" N 82° 43' 27.3792" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 10.328
2 HDPE Pipe PN-6: Class PE-100 75 2.594
3 HDPE Pipe PN-6: Class PE-100 90 0.474
4 HDPE Pipe PN-6: Class PE-100 110 0.218
5 HDPE Pipe PN-6: Class PE-100 140 0.244
6 HDPE Pipe PN-6: Class PE-100 160 0.214
HSC Connection
Sno. Total Nos.
1 350
Other Details
2.06
0.00
0.00
09-Oct-2026
10-Oct-2026