Project Completion Certificate (Ground Water)
Scheme ID: 20019695 Name of Scheme: Bodara No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 2320 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 24-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.05 /81.83 BODARA 26º 14' 2.109" N 82º 51' 41.529" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 30/43 BODARA 26º 14' 2.109" N 82º 51' 41.529" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.455
2 HDPE Pipe PN-6: Class PE-100 75 3.102
3 HDPE Pipe PN-6: Class PE-100 90 1.112
4 HDPE Pipe PN-6: Class PE-100 110 2.140
5 HDPE Pipe PN-6: Class PE-100 140 0.696
6 HDPE Pipe PN-6: Class PE-100 160 0.0265
HSC Connection
Sno. Total Nos.
1 300
Other Details
2.02
0.00
2.01
06-May-2026
20-Jun-2026