Project Completion Certificate (Ground Water)
Scheme ID: 20019753 Name of Scheme: Dinkarpur No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 2750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 10-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.29 /86.51 DINKARPUR 26° 11' 39.966" N 82° 50' 49.3944" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 30 / 43 DINKARPUR 26° 11' 39.966" N 82° 50' 49.3944" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 125/12 DINKARPUR 26° 11' 39.966" N 82° 50' 49.3944" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.327
2 HDPE Pipe PN-6: Class PE-100 75 2.695
3 HDPE Pipe PN-6: Class PE-100 90 2.279
4 HDPE Pipe PN-6: Class PE-100 110 0.232
5 HDPE Pipe PN-6: Class PE-100 140 0.028
6 HDPE Pipe PN-6: Class PE-100 160 0.156
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.97
0.00
0.00
24-Oct-2026
25-Oct-2026