| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019814 | Name of Scheme: Kataiya | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2900 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 03-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 22.00/93.57 | KATAIYA | 28.076052 | 79.670671 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 38.52 M3 / 45 M | KATAIYA | 28.076052 | 79.670671 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 200 KL - 18 M | KATAIYA | 28.076057 | 79.670676 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6 KG | 63 | 2.452 | |
| 2 | HDPE / 6 KG | 75 | 0.327 | |
| 3 | HDPE / 6 KG | 90 | 0.124 | |
| 4 | HDPE / 6 KG | 110 | 1.692 | |
| 5 | HDPE / 6 KG | 140 | 1.137 | |
| 6 | HDPE / 6 KG | 160 | 0.050 | |
| 7 | HDPE / 6 KG | 180 | 0.548 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 535 |