| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020108 | Name of Scheme: Usmanganj W/S Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2014 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2026 | Actual Date of Completion (Capex): 24-Oct-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 19.07/131.27 | USMANGANJ | 27.254262 | 79.59535 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 450 CUM/H | USMANGANJ | 27.254262 | 79.59535 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/12 | USMANGANJ | 27.254262 | 79.59535 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | RISING MAIN | 80 | .027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 2 | |
| 2 | HDPE PIPE | 75 | .143 | |
| 3 | HDPE PIPE | 90 | .582 | |
| 4 | HDPE PIPE | 110 | .186 | |
| 5 | HDPE PIPE | 140 | .13 | |
| 6 | HDPE PIPE | 160 | .847 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 363 |